1,500 Mega Watts Power

Code & Standard

We scheduled the power station inspections daily project check and regular weekly and Monthly maintenance of: Generators, Step-up Transformer, Step-down Transfer, Gas Valves, Gas Pumps, Gas Tank, Power Meters, Gas Meters, Cooling systems and Transmission line.

Technology

Combine Cycle Technology

We embraces the use of Combine Cycle Technology as our major source of energy

.

h

Source Of Energy

Our major Supply of Fuel for Our Generators is Liquefied Natural Gas and also as our Second Major Output.

h

Our Output

Our other product is Pure Bottled Table Water.

Clients

Our Corporate Clients

Abuja Power Station Abaji (APSA)

Welcome to Abuja Power Station, powering the Federal Capital and it's surrounding with 500 MW in a first phase of uninterrupted power supply. Two additional optional phases will bring the total power generation to 1,500 MW. The power station will be developed in order to introduce new and constant power supply to the Nation’s Power Grid. Gas turbine generator powers the electricity generation.

Muhammadu Buhari
President Federal Republic of NIGERIA
and Commander in-chief-of the Armed forces

 

No single cause can be identified to explain Nigerian’s poor economic performance over the years than the power situation. It is a national shame that an economy of 180 million generates only 4,000MW, and distributes even less. Continuous tinkering with the structures of power supply and distribution and close on $20b expanded since 1999 have only brought darkness, frustration, misery, and resignation among Nigerians. We will not allow this to go on. Careful studies are under way during this transition to identify the quickest, safest and most cost-effective way to bring light and relief to Nigerians.

 

 

The Former President , admit that government alone could not solve the problem. He said the success of the reform is hinged on immense private sector participation and involvement at all levels, including power generation and distribution. According to the former President, “government is convinced that it is only by productively engaging the private sector as partners in this journey that we can be assured of success in our resolve to provide a viable power sector reform, and I hope that our efforts will get the support and understanding of all stakeholders in achieving profound success.”

Generation

The British scientist Michael Faraday discovered the fundamental principles of electricity generation during the 1820s and early 1830s. His basic method is still used today: electricity is generated by the movement of a loop of wire, or disc of copper between the poles of a magnet.
A fluid acting as an intermediate energy carrier drives turbines. Many of the heat engines just mentioned are turbines.
The organization responsible for electricity production and supply in Nigeria is the National Electric Power Authority, known as NEPA. (now PHCN Power Holding Company of Nigeria PLC)

About Us

MANAGEMENT
TARGET
Our target is to provide enormous comfort to Nigerians with the utility of high class Technology, Qualified Engineers, Technicians, Craft man and other works of life.

MISSION
Construction and Operation of the Biggest Energy Plant in Abuja Federal Capital of Nigeria.Constructing and Operation of the Biggest Power House in the Federal Capital of Nigeria, Abuja.

VISION
Our vision is to carefully select around the Globe services and accessories for constant delivery of  products and services to all our esteemed dear consumers.

Transmission

The transport of generator-produced electric energy to loads. An electric power transmission system interconnects generators and loads and generally provides multiple paths among them. Multiple paths increase system reliability because the failure of one line does not cause a system failure. Our transmission lines operate with three-phase alternating current (ac).

Company News

June.14, 2013

n

The Engingeering Services Department of FCDA

The Engineering Services Department of FCDA invited Jehata Nigeria Limited for a stakeholders meeting comprising FCDA, AIIC and AICL.

March.14, 2012

Federal Capital Development Authority
The Department of Surveying and Mapping has granted Jehata Nigeria Limited to conduct the Survey and Mapping of the purposed location for the construction and Operation of a 1,500MW Generating Plant in Tsoho Naharati of Abaji Municipal Area Council of FCT Abuja.

Sep.15, 2011

hj

NBET to Supply Power Purchase Agreement with APSA .
After receiving letter of recommendation from the Standing Committee on Independent Power Producers to proceed on the Project.

APSA has established business relationship with the Nigeria Electricity Bulk Trader Plc, APSA is requested to submit Due Diligence Report.

Photo Gallery

Presentation of 500MW Power Plant to the Federal Government of Nigeria

Presentation of 500MW Power Plant to the Federal Government of Nigeria

License

NEWS
 

Abuja Power Station is currently under going Due Diligent Assessment to Obtain On Grid Power Generation License for 500MW and later for 1,000MW

Company News

Apr.08, 2012

NEWS

APSA's MD response to The Punch Newspaper .
The President, Goodluck E. Jonathan's Power sector Reforms cannot be hijacked due to inadequate gas and water supply or by some strikes in the Power Sector as reported by Punch Newspaper on the 7th of April, 2012 by EVEREST AMAEFULE AND FIDELIS SORIWEI  .

March.14, 2012

h

Federal Capital Development Authority
The Department of Surveying and Mapping has granted Jehata Nigeria Limited to conduct the Survey and Mapping of the purposed location for the construction and Operation of a 1,500MW Generating Plant in Tsoho Naharati of Abaji Municipal Area Council of FCT Abuja.

Sep.15, 2011

NBET to Supply Power Purchase Agreement with APSA .
After receiving letter of recommendation from the Standing Committee on Independent Power Producers to proceed on the Project.

APSA has established business relationship with the Nigeria Electricity Bulk Trader Plc, APSA is requested to submit Due Diligence Report.

Our Location

g

Contact Us





APSA

ABUJA POWER STATION ABAJI
Tsoho Naharati, Abaji.

FCT Abuja

Nigeria.

License Owners

JEHATA NIGERIA LIMITED
P.O Box 962, Bauchi, Bauchi State
Phone: +2348113112111
General: abujapowerstation@jehata.com
Web site: www.aps.jehata.com